Z1 Plant / Mead, Oklahoma
A factory designed around the flow.
Traceable components. Dedicated production areas. Quality checkpoints throughout assembly. Discover the thinking behind our planned Mead facility.
The factory concept / Mead, Oklahoma
Separate plants. A connected plan.
Our planned Mead facility brings physically separate battery and inverter areas together under one roof. Dedicated assembly, inspection and testing support a clear path from incoming components to product release.
150 × 200 ftProposed footprint
32 ftProposed building height
30,000 sq ftProposed floor area
Planning concept · Four Unitree H2 Plus robots, two per plant, are part of our proposed approach to assisted material handling. The facility has not yet been commissioned.
Proposed building / Two separate plants
01
Shared front offices
4,500 sq ft proposed at the front of the building.
02
Separate inverter area
Receiving, ESD assembly, testing and dispatch.
03
Separate battery area
Receiving, screening, pack assembly, testing and packing.
04
Controlled material spine
Managed movement between physically separate production areas.
Discover the planned spaces, assembly sequence and quality checkpoints behind our manufacturing vision.
Dedicated programs. A coordinated plan.
01 / Battery program
Built around the pack.
A proposed workflow for pack assembly, BMS integration, inspections and release.
Explore the program ↗02 / Inverter program
Focused on conversion.
A separate development and manufacturing program for power electronics, firmware, assembly and testing.
Explore the program ↗People behind the process.
Our team brings product, engineering and project conversations together. Connect with Z1 to discuss the energy needs of your home, business or next development.
Meet Z1 Plant ↗A conversation is a good place to start
Your project. Our next conversation.
Share your application, requirements and timeline.